Construction of YT Valiant

HOME   REFRESH PAGE   REPORT  DATA  COOL CLIPS  PHOTO GALLERY  SITE MAP  TERMS

 

Construction begins with the fabrication of the skeg, this module acts as the basis that the rest of the boat will be built on

The double bottom tanks are constructed on a metal framework starting with the tank top plating and then the frames

Once the framework is in place, the shell plate is installed

With the fitting complete, the welders take over. They will go inside every section to completely weld all of the frames and shell. Some spaces require a small welder to get into.

The completed module is now ready to lift off the construction jig, it is split in half, separated and pad-eyes are welded for the cranes to attach to.

Each section is placed on trucks (wheels) for transport to the shop/ways.

The double bottom sections are righted and prepared for installation onto the skeg.

The in-house crane carries the first section for installation.

PREVIOUS PAGE  NEXT PAGE

INTRO12345678

HOME   REFRESH PAGE   REPORT  DATA  COOL CLIPS  PHOTO GALLERY  SITE MAP  TERMS

best viewed in 800X600 resolution using MS Internet Explorer 6.0 and above  

Copyright Alpine Computer Service 2010 all rights reserved      specific permissions may be required for use beyond this website