| Construction begins with the fabrication of the skeg, this module acts as the basis that the rest of the boat will be built on | |
|
The double bottom tanks are constructed on a metal framework starting with the tank top plating and then the frames |
|
| Once the framework is in place, the shell plate is installed | |
|
With the fitting complete, the welders take over. They will go inside every section to completely weld all of the frames and shell. Some spaces require a small welder to get into. |
| The completed module is now ready to lift off the construction jig, it is split in half, separated and pad-eyes are welded for the cranes to attach to. | |
|
Each section is placed on trucks (wheels) for transport to the shop/ways. |
|
| The double bottom sections are righted and prepared for installation onto the skeg. | |
|
The in-house crane carries the first section for installation. |
HOME REFRESH PAGE REPORT DATA COOL CLIPS PHOTO GALLERY SITE MAP TERMS
best viewed in 800X600 resolution using MS Internet Explorer 6.0 and above
Copyright Alpine Computer Service 2010 all rights reserved specific permissions may be required for use beyond this website