Construction of YT Valiant

HOME   REFRESH PAGE   REPORT  DATA  COOL CLIPS  PHOTO GALLERY  SITE MAP  TERMS

The first of two double bottom sections placed on the skeg, timbers are used to maintain stability during the construction.

Installing the main engine foundations

One of two Caterpillar 3512 diesel engines set on the foundation.

Beginning to build the bulkheads that will makeup the forward and aft engine room section.

One of several bulkheads with stiffeners and girders.

A forward bulkhead that will become the start of the bow section.

Finishing up the welding on another bulkhead.

Installing one of many side frames

PREVIOUS PAGE  NEXT PAGE

INTRO12345678

HOME   REFRESH PAGE   REPORT  DATA  COOL CLIPS  PHOTO GALLERY  SITE MAP  TERMS

best viewed in 800X600 resolution using MS Internet Explorer 6.0 and above  

Copyright Alpine Computer Service 2010 all rights reserved      specific permissions may be required for use beyond this website