HOME REFRESH PAGE REPORT DATA COOL CLIPS PHOTO GALLERY SITE MAP TERMS
| Stern section completed and ready for installation. | |
|
The bow section constructed and ready for installation. |
|
| A view of the bow (nearest), stern (second from front), the deck house (3rd section from front) and the mid section in the ways (4th section far back). | |
|
Installing the Z-drive section in the ways. |
| Installing the bow section. | |
|
Completed bow installation, the welders will now weld all the internal frames, bulkheads and seams. |
|
| Stern section being lifted into place |
|
Making up the main deck of the stern section using strong-backs and turn-buckles. |
| Preparing to lift the deckhouse onto the boat, some parts are omitted to provide clearance overhead, these parts will be installed after the house is fit on the main deck. |
|
Looking forward, the aft bulwark framing is installed next. |
![]() |
HOME REFRESH PAGE REPORT DATA COOL CLIPS PHOTO GALLERY SITE MAP TERMS
best viewed in 800X600 resolution using MS Internet Explorer 6.0 and above
Copyright Alpine Computer Service 2010 all rights reserved specific permissions may be required for use beyond this website