HOME   REFRESH PAGE   REPORT  DATA  COOL CLIPS  PHOTO GALLERY  SITE MAP  TERMS

The capstan, forward winch and aft rubber fender ready to go on the boat.

Aft bit installed and ready to be welded

With the ways enveloped in plastic, the major sandblasting and painting starts.

Primer paint is applied.

Bottom paint is complete and allowed to cure.

Nearly completed hull looking aft.

The remaining rubber fenders are installed.

Ready for launch!

 

The boat slips into the water. Another tug (right forward) built by J. M. Martinac Shipbuilding stands by to catch the new tug. The boat in the background is being built for Boston Towing.

Click on the photo for a full sized suitable for framing view.

DOWNLOAD

Watch a video of the launch

video is 52 MB in size, this may take several minutes to download, video is in Windows format

PREVIOUS PAGE  NEXT PAGE

INTRO12345678

HOME   REFRESH PAGE   REPORT  DATA  COOL CLIPS  PHOTO GALLERY  SITE MAP  TERMS

best viewed in 800X600 resolution using MS Internet Explorer 6.0 and above  

Copyright Alpine Computer Service 2010 all rights reserved      specific permissions may be required for use beyond this website