| Fire Fighting system pump is installed and connected to the main engine's power-take-off. | |
|
Internal fire suppression system is installed and ready for suppression service. |
|
| Two John Deere 130 KW generators, these provide for all of the electrical needs aboard the vessel. | |
|
Starboard main engine looking aft. |
| Upper Z-drive unit with prop shaft guards. | |
|
External fire fighting equipment and piping are finished and ready for testing. |
|
| Sea Trials, let's see what she can do! |
|